Solar, Inverters and Battery Systems: Is Your Installation Properly Authorised?

Your solar or backup-power system is installed, it works perfectly, and you have an electrical Certificate of Compliance (CoC). So everything must be compliant, right? Not necessarily.

An electrical CoC and the registration or authorisation required by an electricity supplier are not necessarily the same thing. Missing paperwork sometimes only comes to light when the homeowner wants to sell.

Watch on YouTube (opens in a new tab)

Why the distinction matters

An electrical CoC addresses the electrical installation. Depending on the system and supplier, a homeowner may also need permission to install, registration or authorisation, an approved inverter, commissioning documents and professional sign-off.

These requirements are not just administrative. Correct installation and authorisation help protect residents, electricians and people working on the electricity network.

We are property practitioners, not electricians or SSEG specialists. Our purpose is to make homeowners aware of the questions to ask, rather than certify a system or give technical advice.

Start by identifying your electricity supplier

In Cape Town's northern suburbs, one home may receive electricity from the City of Cape Town and another directly from Eskom. The requirements depend on who actually supplies the property. Do not assume that a neighbour's approval process applies to your home.

If the City of Cape Town supplies your electricity

For applicable new solar PV and/or battery installations in its supply area, the City requires an online application through its Energy Services platform. It treats new solar PV and battery applications as grid-tied, requires approved equipment and the applicable professional sign-off, and uses a staged approval process.

Importantly, a Permission to Install is not the same as permission to switch the system on. The City's process provides for installation after that permission, followed by the required CoC and commissioning documentation. The system must not be switched on until the City has issued its commissioning approval.

The City also maintains an approved-inverter list. Some products, such as particular portable backup devices or solar water-heating arrangements, can fall under different rules. Have a competent professional establish how your specific installation is classified.

Consult the City of Cape Town's official website for authorisation guidance.

If Eskom supplies your electricity

Eskom's published guidance says households and small businesses with embedded generation systems below 100 kVA must register them, even when the system is configured not to export power. Fully independent off-grid arrangements are treated differently, but Eskom may require proof that they are not connected to its network.

Eskom distinguishes registration from the technical authorisation needed for grid-connected operation. Ask Eskom what steps and documents are required for your installation rather than assuming that registration alone completes every requirement.

Consult Eskom's official website for its small-scale embedded generation guidance.

Five checks every homeowner should make

  1. Who supplies the electricity? Confirm whether it is the City, Eskom or another municipality.
  2. Does your CoC cover the work? Ask your installer about the original installation and any later changes.
  3. Was the correct registration or authorisation process completed? A working system, or one set not to feed power back into the grid, is not proof of exemption.
  4. Can you produce the documents? Request copies of approvals, registration confirmation, inverter details and any required commissioning or professional sign-off records.
  5. Has the system changed? If panels, inverters or batteries have been added or replaced, check whether the supplier needs updated information or approval.

Use a suitably qualified installer or electrical/SSEG professional. But do not rely only on being told that everything is compliant. Keep the actual documents and confirm the supplier's requirements directly.

Why this matters when selling your property

Solar and backup power can be an attractive feature, but a buyer may reasonably ask what equipment is included, whether it belongs to the seller, and whether the installation has the required documentation.

Keep relevant CoCs, approval records, equipment specifications and warranties together. If equipment is leased or financed, disclose and clarify the arrangement. The sale agreement should also clearly identify what remains with the property. Read our fixtures and fittings guide (opens in a new tab) for more on that distinction.

Our advice

If you are planning a new installation, establish the correct process before the work starts and obtain the necessary permission before switching the system on. If you already have a system but are unsure about its status, ask a suitably qualified professional to help and confirm the position with your electricity supplier.

A working system and an electrical CoC are important, but they do not automatically prove that every required supplier process has been completed. It is better to establish that now than discover missing documentation later.

This article is general homeowner information, not electrical, engineering or legal certification. Requirements depend on your installation and electricity supplier and may change. Obtain confirmation directly from the supplier and suitably qualified professionals.